Anna's Sci-Fest Project '26 · Analysis 2

How fast should
Irish trains run?

The 200 km/h ceiling · the cost of speed · express four-tracking.

Analysis 2 asks not which lines to reopen but how fast trains should run. The short answer, from the All-Island Strategic Rail Review: 200 km/h is the economic ceiling — faster does not pay.

Today's speeds

Dublin–Cork is the fastest line, and the only one cleared for the top speed. The island's maximum is 160 km/h (100 mph) on Dublin–Cork and 145 km/h (90 mph) in Northern Ireland. What passengers feel is the average city-to-city speed, far lower because of stops, curves and single track (rounded, so indicative):

RouteRail distanceFastest timeAverage speed
Dublin–Cork~266 km~2h 30~105 km/h
Dublin–Belfast181 km~2h 05~85 km/h
Dublin–Limerick~200 km~2h 10~90 km/h
Dublin–Galway~210 km~2h 30~84 km/h
Dublin–Sligo~215 km~3h 00~72 km/h
Dublin–Waterford~160 km~2h 15~71 km/h

Why 200 km/h is the ceiling

The economic ceiling is 200 km/h — faster does not payEach speed tier and the Review's verdict on it250–300 km/hSegregated high-speed railRejectedcosts outweigh benefits; build-carbon not offset~200 km/hUpgraded, electrified intercityRecommended ceilingbeats the car; net economic benefit160 km/hToday's best (Dublin–Cork)Current caplimited by fleet and signallingup to 120 km/hMuch of the network todayRaise to this floorRec 10: at least 120 km/hThe Review: diminishing economic returns in targeting speeds above 200 km/h.

To average 120 km/h — fast enough to beat the car once stops are allowed for — trains need to run at up to 200 km/h. That is the Review's target. Above it, the only way to go faster is a dedicated, segregated high-speed line, which the Review assessed as a 300 km/h network and rejected: the benefits would be significantly outweighed by the costs, with diminishing economic returns in targeting speeds above 200km/h and construction carbon that would not be offset.

What speed costs

Tier A — lift the slow network

Curve easing, track and signalling on existing alignments to the Review's “at least 120 km/h” minimum, largely within ongoing renewals.

Tier B — a 200 km/h electrified railway

New trains plus signalling, track, level-crossing and electrification upgrades. The recommended tier. Whole programme: €32bn (2021) / €35–37bn (2023), about €1.3bn a year for ~25 years.

Tier C — 250–300 km/h high-speed

A new segregated alignment end-to-end. Rejected on cost, carbon and value-for-money grounds.

Express running & the cost of overtaking

The cheapest speed gain is not a faster train but a train that stops less. A Dublin–Cork express that skips stops saves minutes per stop. The catch: on two tracks it soon catches the stopper ahead, so express running only works if the fast train can overtake — which needs extra track, either four-tracking at the pinch points or shorter passing loops.

DublinCorkBelfastGalwaySligoLimerickWaterfordClongriffinDroghedaNewryHazelhatchPortarlington
200 km/h corridor Four-tracking pinch-point Rest of network

The pinch-points sit at the busy Dublin approaches, where intercity expresses share tracks with Dublin Area Rapid Transit (DART) and commuter stoppers. Four-tracking there lets the fast trains pass. Costs (from the Review's table, 2021 prices):

WorkCost
Dublin–Cork speed improvements€500–800m
Four-track: Dublin–Clongriffin€700m–€1.0bn
Four-track: Clongriffin–Drogheda€600m–€1.0bn
Four-track: Hazelhatch–Portarlington€1.1–1.8bn
Four-track: Belfast–Newry€1.8–2.8bn

Four-tracking is a joint product — the same tracks serve frequency, capacity and express overtaking — so its cost is justified by growth, not charged to express alone. The Review calls four-tracking the Dublin approaches essential to enable the intercity network to grow.

What speed, on what routes

Build to 200 km/h on the two corridors that can fill it — Dublin–Cork and Dublin–Belfast — lift everything else to a 120 km/h floor, and build nothing for 300 km/h.

CorridorTargetTierWhy
Dublin–Cork200 km/hBStraightest, busiest; the prime 200 candidate, with demand to fill it
Dublin–Belfast200 km/hBFlagship corridor; new fleet + four-tracking; sub-2-hour target
Limerick / Galway / Waterford120→160, 200 selectivelyA→BMixed alignment; hit the floor, raise straight sections where it pays
Western & border linesat least 120 km/hAThin, winding, low-demand; raise the floor through renewals
Any corridor at 250–300 km/hnoneCRejected island-wide: diminishing returns, carbon, value for money

The two 200 km/h corridors are firm; the middle rows apply the Review's logic (it commits to a 200 km/h core and a 120 km/h minimum but publishes no line-by-line speed table). Route averages above are computed from rounded distances and times.

Visualise the trade-off

The two curves below are the Review's conclusion in one picture: the benefit of going faster rises steeply at first, then flattens once rail beats the car around 200 km/h, while the cost stays modest up to 200 km/h and then climbs steeply for a segregated high-speed line.

Tier ATier B · recommendedTier C · rejected120160200250300Top speed (km/h)200 km/h — recommended ceilingBenefit flattens; cost turns into a cliff

● Benefit (time saved, modal shift)    ● Capital cost — schematic of the Review's qualitative finding; beyond 200 km/h only a segregated line can go faster, at a far higher cost.

Test a corridor at different top speeds

Pick a route and drag the top speed. The journey time and the “beats the car” test improve with speed, but the tier badge shows the catch: above 200 km/h the only way faster is a segregated line the Review rejected.

Top speed 200 km/h
120160200250300
Service pattern
Modelled journey time
2h 08
Illustrative. Corridor distances, today's journey times, road times and the tier definitions are from the All-Island Strategic Rail Review. The in-between journey times are modelled (distance ÷ an average-speed curve anchored to today's time); the Review does not publish a per-speed timetable. Above 200 km/h a fully segregated new line would be needed. A “direct” service assumes no intermediate stops (about 4 minutes saved per stop skipped).

The interactive speed explorer is on the live page at trainproject.org/speed.html

References

  1. All-Island Strategic Rail Review, Department of Transport / gov.ie, 2024 — speed targets, costs (incl. the four-tracking table), the 300 km/h rejection.
  2. Mark 4 (Iarnród Éireann), Wikipedia — 160 km/h operating, 200 km/h design.
  3. Enterprise (train service), Wikipedia — Dublin–Belfast times and the new fleet.
  4. Transport Appraisal Framework, gov.ie — discount rate and value of time behind the valuation.